I do have to agee with the "majority" on this as I was not detailed on my first comment.
Yes, I do ground at the power meter as the first and main option.
But, if all else fails. I do ground to the frame and do a ground test.
Re: MOBLIE hOME FRAME GROUNDING
There is 1 reply to this message