I would like to hear some feedback on what pay should be to work on dual plant, the mso seems to think you are already there & you just have to cut an extra connector.
On some of the plant we work A side is already upgraded but B side is still working. The system prints show A side only so you have to go figure B side that is designed different.
You are having to verify the drops are reconnected without crossing a/b.
Seems to me you are already there but you are doing twice the work.
Dual cable
There are 2 replies to this message