Just got back from there (Just Now) If I ramble it was a long drive and I drove straight through . Mastec & Sealtec having a tug of war. I'm a fiber splicer and they wanted to put us on piece work and I jetted. Always waiting on construction crews to put up fiber lucky to get two cases a day. They have a **** load of work, major destruction, But they don't really realize the about of damage. I've talked to the Walk out crews and there is tons of work. BUT they have about 75 of there nodes up and they want to pinch pennys. The cable one office that use to have the area full of trucks and tents are empty today.
Just do yourself a favor and confirm prices before you go.
Bed Time
Re: info on mad dog directional
There is 1 reply to this message