very well said. but i have found that going the extra mile gets you no where. i was never an installer, only main line construction, then started sat when cable got slow. my work looks a lot better than that. and he is probably 1 of those midspan drop around the main line installers too.
This is CABL.com posting #145341. Tiny Link: cabl.co/mLYn