I am in the same boat. I have an amp that feeds power to the node and I must pull the mother board to put in a H to H so that I can put a tap on for status monitoring was told that I would have to give a 4 day notice and work can only be done 2:00am to 5:00 am.
This is CABL.com posting #145212. Tiny Link: cabl.co/mLWi