Create your free account now! Sign up

Re: chutes


scrap the tap bracket method//drill 2 holes with pole bit 2-3 inches from end of pvc //both holes on same side of sweep// then drill one hole in center on reverse side of sweep. install 6-8 foot rope through center hole( for securing to pole) (or wrap around chute and strand on output or mid-span 90), Use proper size preforms on outer hole to secure to strand. If space limited can substitute a bitch clamp and preform or strand vice. Hint: for o/put s/up wrap rope around strand towards path of jigging 4 times then bring rope under loops back toward s/up. Then you can either secure it to pole, strand(with preform), or tie it to thr./rope and tie it to trailer. I braid all my ropes.
(confused)(cool)(clap)(beerchug)(usa)
just an old lineman//grew up with a sawdust pumper in between my belt. chased a 1 ton for years run a T40-C(PRO)//I actually know how to operate it. never could figure out that sawdust pumper//he//he
This is CABL.com posting #140892. Tiny Link: cabl.co/mKOC
Posted in reply to: Re: chutes by danimal
There is 1 reply to this message
Re: chutes danimal 1/20/2005 8:03:00 AM