You must provide the DETAIL of the job in order to get your "Ball park" quote!
How many units in all?
How many buildings?
Are the units stacked?
Are you postwiring internally or externally?
What additional things are included in the bid i.e.,
moulding, brick work, lock-box setup and activation, auditing, internal penetration via the maintenance dept.
How about the Design and Engineering? What are the current network operating levels? Do you have to design a node into the system? How long can the longest drop be? What is the shortest drop? Are you going to install NIU's for telephony?
These are just some of the questions that should be answered prior to sending out an APB (All points bulletin).
Zoots