STORM $1000 MOBILIZATION STARTING MONDAY
Independent Contractor
Florida
Starts
WE NEED TO HAVE OUR HEAD COUNT IN BY FRIDAY WITH POTENTIAL START DATE OF SATURDAY
Pay
WEEKLY
Qualifications
MUST BE 3 MAN CREW. MUST HAVE BUCKET TRUCK AND TRAILERS. MUST HAVE ALL NECESSARY TOOLS, EQUIPMENT SAFETY GEAR , SAFTEY SIGNS .
Job Description
STORM CREWS NEEDED BY THE HUNDREDS!
START DATE: HEADCOUNTS OF ALL CREWS NEEDED BY FRIDAY WITH A POTENTIAL START OF SATURDAY
MOBILIZATION: $1000 PER CREW
HOURS: OPEN PAY WILL RANGE FROM $10,000 to $20,000+ WEEKLY PER CREW DEPENDING ON POSITION AND HOURS BILLED
PAY: WEEKLY
POSITIONS AVAILABLE:
3 Man Crew Aerial Construction
2 Man Crew Fiber Splicing
2 Man Crew Coax Splicing
Locations: ALL OF FLORIDA DAMAGED BY HURRICANE IAN
MUST HAVES:
*AERIAL CONSTRUCTION*
-BUCKET TRUCKS &TRAILERS
-SAFETY SIGNS "UTILITY WORK AHEAD SIGNS"
-SAFETY CONES
-VOLTAGE DETECTORS
-CLASS 3 HOT GLOVES
AND ALL NECESSARY TOOLS, EQUIPMENT AND SAFETY GEAR TO COMPLETE ALL ASPECTS OF AERIAL CONSTRUCTION
*FIBER SPLICERS*
MUST BE A 2 MAN CREW
CAN HAVE THE FOLLOWING
-SPLICE LAB/TRAILER
-SPLICE VAN
-BUCKET TRUCK= MORE MONEY
-ALL NECESSARY SPLICING EQUIPMENT AND METERS FOR TESTING IF NECESSARY
-SAFETY SIGNS "UTILITY WORK AHEAD SIGNS"
-SAFETY CONES
-VOLTAGE DETECTORS
*COAX SPLICERS*
(NOTE: COAX SPLICING IS NOT PLACING FITTINGS ON RG-6 OR RG-11-DROPS SO PLEASE DO NOT WASTE YOUR TIME CALLING )
CAN HAVE THE FOLLOWING
WORK TRUCK, WITH 28FT FIBER GLASS LADDER WITH STRAND HOOKS.
-BUCKET TRUCKS= MORE MONEY
-SAFETY SIGNS "UTILITY WORK AHEAD SIGNS"
-SAFETY CONES
-VOLTAGE DETECTORS
START DATE: HEADCOUNTS OF ALL CREWS NEEDED BY FRIDAY WITH A POTENTIAL START OF SATURDAY
MOBILIZATION: $1000 PER CREW
HOURS: OPEN PAY WILL RANGE FROM $10,000 to $20,000+ WEEKLY PER CREW DEPENDING ON POSITION AND HOURS BILLED
PAY: WEEKLY
POSITIONS AVAILABLE:
3 Man Crew Aerial Construction
2 Man Crew Fiber Splicing
2 Man Crew Coax Splicing
Locations: ALL OF FLORIDA DAMAGED BY HURRICANE IAN
MUST HAVES:
*AERIAL CONSTRUCTION*
-BUCKET TRUCKS &TRAILERS
-SAFETY SIGNS "UTILITY WORK AHEAD SIGNS"
-SAFETY CONES
-VOLTAGE DETECTORS
-CLASS 3 HOT GLOVES
AND ALL NECESSARY TOOLS, EQUIPMENT AND SAFETY GEAR TO COMPLETE ALL ASPECTS OF AERIAL CONSTRUCTION
*FIBER SPLICERS*
MUST BE A 2 MAN CREW
CAN HAVE THE FOLLOWING
-SPLICE LAB/TRAILER
-SPLICE VAN
-BUCKET TRUCK= MORE MONEY
-ALL NECESSARY SPLICING EQUIPMENT AND METERS FOR TESTING IF NECESSARY
-SAFETY SIGNS "UTILITY WORK AHEAD SIGNS"
-SAFETY CONES
-VOLTAGE DETECTORS
*COAX SPLICERS*
(NOTE: COAX SPLICING IS NOT PLACING FITTINGS ON RG-6 OR RG-11-DROPS SO PLEASE DO NOT WASTE YOUR TIME CALLING )
CAN HAVE THE FOLLOWING
WORK TRUCK, WITH 28FT FIBER GLASS LADDER WITH STRAND HOOKS.
-BUCKET TRUCKS= MORE MONEY
-SAFETY SIGNS "UTILITY WORK AHEAD SIGNS"
-SAFETY CONES
-VOLTAGE DETECTORS
Contact
x x x x Canceled/Expired Listing x x x x
listed •
expires
job listing #107459 •
tiny link cabl.co/eB7n